Data through FY2026 Q3 (Jun 30, 2026)
Civil Design Engineer
Occupation profile for Civil Design Engineer covers 18 filings across the reporting window. FY2026 certified median offer: $86,917.
- FY2026 certified median
- $86,917
- Total filings
- 18
- FY2026 25th–75th percentile
- $81,476–$89,400
- Top employer
- Tasacom Technologies Inc.
| Fiscal year | Filings | Median | 25th percentile | 75th percentile |
|---|---|---|---|---|
| FY2024 | 6 | $79,013 | $74,129 | $85,250 |
| FY2025 | 8 | $78,000 | $69,618 | $82,870 |
| FY2026 (Q1–Q3) | 4 | $86,917 | $81,476 | $89,400 |
FY2026 is partial (*). Its filing totals are not comparable to a full fiscal year.
Median offer by fiscal year
Top employers
- Tasacom Technologies Inc.3 filings
- L&T Technology Services Limited2 filings
- ADCCRC LLC1 filings
- AECOM Technical Services, Inc.1 filings
- Ardurra Group, Inc.1 filings
- Cannon Corporation1 filings
- Christopher B. Burke Engineering, Ltd.1 filings
- Delta Engineering Group, LLC1 filings
- Ferrovial Construction US Corp.1 filings
- GC Engineering, Inc.1 filings
Top cities
- Dallas3 filings
- Phoenix2 filings
- Houston2 filings
- Los Angeles1 filings
- Chicago1 filings
- Rosemont1 filings
- Pineville1 filings
- Detroit1 filings
- Grand Rapids1 filings
- Philadelphia1 filings
Filings by employer and title
Prevailing wages by area and occupation
The OFLC wage year runs from July through June. Worksites use the area of the most frequently reported county with a matching wage area for their city.
| Wage year | Area | SOC | Level I | Level II | Level III | Level IV |
|---|---|---|---|---|---|---|
| 2026-27 | Dallas-Fort Worth-Arlington, TXArea 19100 | 17-2051 | $67,517 | $84,718 | $101,899 | $119,101 |
| 2026-27 | Houston-Pasadena-The Woodlands, TXArea 26420 | 17-2051 | $71,386 | $91,291 | $111,176 | $131,082 |
| 2026-27 | Chicago-Naperville-Elgin, IL-INArea 16980 | 17-2051 | $73,424 | $89,898 | $106,371 | $122,845 |
| 2026-27 | Phoenix-Mesa-Chandler, AZArea 38060 | 17-2051 | $67,850 | $82,763 | $97,698 | $112,611 |
| 2026-27 | Alexandria, LAArea 10780 | 17-2051 | $59,987 | $78,874 | $97,781 | $116,667 |
| 2026-27 | Austin-Round Rock-San Marcos, TXArea 12420 | 17-2051 | $70,491 | $88,421 | $106,330 | $124,259 |
| 2026-27 | Detroit-Warren-Dearborn, MIArea 19820 | 17-2051 | $68,349 | $81,432 | $94,515 | $107,598 |
| 2026-27 | Grand Rapids-Wyoming-Kentwood, MIArea 24340 | 17-2051 | $65,374 | $79,539 | $93,704 | $107,869 |
| 2026-27 | Jackson, TNArea 27180 | 17-2051 | $75,234 | $86,757 | $98,259 | $109,782 |
| 2026-27 | Los Angeles-Long Beach-Anaheim, CAArea 31080 | 17-2051 | $77,979 | $98,946 | $119,912 | $140,878 |