H-1B Wage Lookup

Data through FY2026 Q3 (Jun 30, 2026)

ELECTRONIC ENGINEER

Occupation profile for ELECTRONIC ENGINEER covers 31 filings across the reporting window. FY2026 certified median offer: $113,360.

FY2026 certified median
$113,360
Total filings
31
FY2026 25th–75th percentile
$108,234–$127,715
Top employer
ADVANCED ENERGY INDUSTRIES, INC.
Certified offers by fiscal year
Fiscal yearFilingsMedian25th percentile75th percentile
FY202415$85,289$79,644$97,100
FY20259$97,927$83,311$132,595
FY2026 (Q1–Q3)7$113,360$108,234$127,715

FY2026 is partial (*). Its filing totals are not comparable to a full fiscal year.

Median offer by fiscal year

Certified median offer, ELECTRONIC ENGINEERFY2024 $85,289; FY2025 $97,927; FY2026 (Q1–Q3) $113,360$0$40,000$80,000$120,000FY2024$85,289FY2025$97,927FY2026 (Q1–Q3)$113,360Certified median offer, ELECTRONIC ENGINEERFY2024 $85,289; FY2025 $97,927; FY2026 (Q1–Q3) $113,360$0$40k$80k$120kFY2024$85,289FY2025$97,927FY2026*$113,360
Certified H-1B LCAs, $15k–$2M, DOL OFLC

Top employers

  1. ADVANCED ENERGY INDUSTRIES, INC.8 filings
  2. Apple Inc.2 filings
  3. MKS Instruments, Inc.2 filings
  4. POLYTEC USA CORP2 filings
  5. Advanced Power Technologies, LLC1 filings
  6. Carl Zeiss Meditec, Inc.1 filings
  7. Cellex, Inc.1 filings
  8. FHP MANUFACTURING COMPANY1 filings
  9. Georgia Green Power, Inc.1 filings
  10. Henglong USA Corporation1 filings

Top cities

  1. Redwood City2 filings
  2. Fort Collins2 filings
  3. Wilmington2 filings
  4. Troy2 filings
  5. Eden Prairie2 filings
  6. Rochester2 filings
  7. Dayton2 filings
  8. Austin2 filings
  9. Houston2 filings
  10. Boulder1 filings

Filings by employer and title

  1. ADVANCED ENERGY INDUSTRIES, INC. · ELECTRONIC ENGINEER8 filings

Prevailing wages by area and occupation

The OFLC wage year runs from July through June. Worksites use the area of the most frequently reported county with a matching wage area for their city.

Annual prevailing wage levels
Wage yearAreaSOCLevel ILevel IILevel IIILevel IV
2026-27Detroit-Warren-Dearborn, MIArea 1982017-2072$94,702$108,805$122,907$137,010
2026-27Austin-Round Rock-San Marcos, TXArea 1242017-2072$100,131$126,235$152,360$178,464
2026-27Boston-Cambridge-Newton, MA-NHArea 1446017-2072$103,189$128,440$153,712$178,963
2026-27Fort Collins-Loveland, COArea 2266017-2072$89,898$114,338$138,757$163,197
2026-27Houston-Pasadena-The Woodlands, TXArea 2642017-2072$89,814$110,947$132,080$153,213
2026-27Rochester, NYArea 4038017-2072$76,981$92,997$108,992$125,008
2026-27San Francisco-Oakland-Fremont, CAArea 4186017-2072$108,846$138,528$168,189$197,870
2026-27Atlanta-Sandy Springs-Roswell, GAArea 1206017-2072$86,382$116,230$146,099$175,947
2026-27Buffalo-Cheektowaga, NYArea 1538017-2072$77,043$94,661$112,278$129,896
2026-27Dayton-Kettering-Beavercreek, OHArea 1943017-2071$76,170$93,829$111,509$129,168