H-1B Wage Lookup

Data through FY2026 Q3 (Jun 30, 2026)

Sr. Production Engineer

Occupation profile for Sr. Production Engineer covers 17 filings across the reporting window. FY2026 certified median offer: $142,740.

FY2026 certified median
$142,740
Total filings
17
FY2026 25th–75th percentile
$132,512–$160,805
Top employer
Yahoo Holdings Inc.
Certified offers by fiscal year
Fiscal yearFilingsMedian25th percentile75th percentile
FY20243$166,962$123,481$166,962
FY202510$134,150$130,733$177,710
FY2026 (Q1–Q3)4$142,740$132,512$160,805

FY2026 is partial (*). Its filing totals are not comparable to a full fiscal year.

Median offer by fiscal year

Certified median offer, Sr. Production EngineerFY2024 $166,962; FY2025 $134,150; FY2026 (Q1–Q3) $142,740$0$60,000$120,000$180,000FY2024$166,962FY2025$134,150FY2026 (Q1–Q3)$142,740Certified median offer, Sr. Production EngineerFY2024 $166,962; FY2025 $134,150; FY2026 (Q1–Q3) $142,740$0$60k$120k$180kFY2024$166,962FY2025$134,150FY2026*$142,740
Certified H-1B LCAs, $15k–$2M, DOL OFLC

Top employers

  1. Yahoo Holdings Inc.14 filings
  2. Lion Elastomers1 filings
  3. LITE MAGNESIUM PRODUCTS INC1 filings
  4. SKT America, Inc.1 filings

Top cities

  1. Mountain View5 filings
  2. Reston2 filings
  3. Little Rock1 filings
  4. San Jose1 filings
  5. Santa Clara1 filings
  6. Atlanta1 filings
  7. Commerce1 filings
  8. Indianapolis1 filings
  9. Geismar1 filings
  10. Germantown1 filings

Filings by employer and title

  1. Yahoo Holdings Inc. · Sr. Production Engineer14 filings

Prevailing wages by area and occupation

The OFLC wage year runs from July through June. Worksites use the area of the most frequently reported county with a matching wage area for their city.

Annual prevailing wage levels
Wage yearAreaSOCLevel ILevel IILevel IIILevel IV
2026-27San Jose-Sunnyvale-Santa Clara, CAArea 4194015-1299$113,672$154,482$195,270$236,080
2026-27Washington-Arlington-Alexandria, DC-VA-MD-WVArea 4790015-1251$78,936$103,230$127,546$151,840
2026-27Atlanta-Sandy Springs-Roswell, GAArea 1206015-1252$91,915$113,776$135,658$157,518
2026-27Austin-Round Rock-San Marcos, TXArea 1242015-1299$69,264$97,989$126,714$155,438
2026-27Baton Rouge, LAArea 1294017-2112$87,298$109,678$132,059$154,440
2026-27North Georgia nonmetropolitan areaArea 130000117-2071$80,018$95,347$110,656$125,986
2026-27Indianapolis-Carmel-Greenwood, INArea 2690017-2141$73,070$89,045$105,040$121,014
2026-27Little Rock-North Little Rock-Conway, ARArea 3078015-1252$72,405$90,667$108,930$127,192
2026-27San Jose-Sunnyvale-Santa Clara, CAArea 4194015-1231$80,080$107,869$135,658$163,446
2026-27San Jose-Sunnyvale-Santa Clara, CAArea 4194015-1251$98,280$124,405$150,509$176,634